This is a photo story showing the new water tank that was fitted on 12 October 2017.
- The new tanks had to be carried up the stairs
- Each tank was in two halves with a lid
- Kelsey Park from the roof
- Here’s the old tank waiting to be removed
- The first job is emptying the old tank
- Which took a while
- And meant some cramped working
- The tank is out
- It is quite mucky
- with unpleasant looking “growths”
- all over
- Inside and out
- The rear tank goes in
- And now the front tank
- David welds the new outlet pipes
- that are in gleaming 100mm copper
- Here’s the finished article with all the vents to the outside
- Work continued till after sunset